the consumer of BESCOM residing at , hereinafter, referred to as the "Seller" is giving consent for the following.
a. The Seller intends to connect and operate the Distributed Solar Photo Voltaic (DSPV) system with BESCOM’s HT/LT Distribution system for sale of Solar Power to BESCOM, in terms of the “Karnataka Electricity Regulatory Commission (KERC) Order dated: 09.07.2025 ”.
b. The Seller intends to install a SRTPV system of kWp capacity on the existing roof top of the premises, situated at and bearing number RR. No in the same premises, under Sub-Division of BESCOM.
c. The Seller intends to sell the energy, generated from the SRTPV system to BESCOM on gross metering basis, from the date of commissioning of the SRTPV system.
Explanation: the ‘Commissioning’ means the stage at which the SRTPV system starts generating the power for the use by the Seller and injects surplus power if any, into the grid.
d. BESCOM intends to purchase the energy, generated by such SRTPV system, on Gross-metering basis, at the tariff determined by the KERC.
Now therefore, in consideration of the foregoing premises, the parties, hereto, intending to be legally bound, hereby agree as under:
e. The BESCOM shall pay for the Gross energy at Rs per kWh,as determined by the KERC order dated: 09.07.2025 for term of this agreement
f. If for any reason the date of commissioning is delayed, beyond the date of commissioning agreed. The tariff payable by the BESCOM shall be lower of the:
g. The Seller, shall pay the Electricity tax and other statutory levies, pertaining to SRTPV generation, as may be levied from time to time.
h. The Seller shall not have any claim for compensation, if the Solar power generated by his SRTPV system could not be absorbed by the distribution system due to failure of power supply in the grid/distribution system for the reasons, such as line clear, load shedding and line faults, whatsoever.
i. This agreement shall be in force for a period of 25 years from the date of commissioning of the SRTPV system as detailed in the BESCOM Standard Operating Procedure (SoP).
j. All the disputes between the parties arising out of or in connection with this agreement shall be first tried to be settled through mutual negotiation. The parties shall resolve the dispute in good faith and in equitable manner. In case of failure to resolve the dispute, either of the parties may approach the appropriate Forum.
I undertake to abide by the provisions of:
I affirm that the information provided above is true and correct to the best of my knowledge and belief, and I have read and understood the terms and conditions governing the installation and operation of the SRTPV system under the Gross Meter Scheme.
I hereby declare that the information provided above is true and correct to the best of my knowledge and belief.the consumer of BESCOM residing at ,hereinafter, referred to as the "Prosumer" is giving consent for the following, who is generating, consuming and injecting the energy.
a. The Prosumer intends to connect and operate the Distributed Solar Photo Voltaic (DSPV) system with BESCOM’s HT/LT Distribution system for sale of Solar Power to BESCOM, in terms of the “Karnataka Electricity Regulatory Commission (KERC) Order dated: 09.07.2025.
b. The Prosumer intends to install a DSPV system of kWp capacity on the existing roof top of the premises, situated at and bearing number RR. No in the same premises, under of BESCOM.
c. The Prosumer intends to sell the energy, generated from the DSPV system to BESCOM on net metering basis, from the date of commissioning of the DSPV system.
Explanation: the ‘Commissioning’ means the stage at which the DSPV system starts generating the power for the use by the Prosumer and injects surplus power if any, into the grid.
d. BESCOM intends to purchase the energy, generated by such DSPV system, on Net-metering basis, at the tariff determined by the KERC.
Now therefore, in consideration of the foregoing premises, the parties, hereto, intending to be legally bound, hereby agree as under:
e. The BESCOM shall pay for the net energy at Rs per kWh,as determined by the KERC order dated: 09.07.2025 for term of this agreement
f. The Prosumer shall commission the project as per KERC / BESCOM Standard Operating Procedure(SOP). If for any reason the date of commissioning is delayed, beyond the date of commissioning agreed. The tariff payable by the BESCOM shall be lower of the.
g. The Prosumer, shall pay the Electricity tax and other statutory levies, pertaining to DSPV generation, as may be levied from time to time.
h. The Prosumer shall not have any claim for compensation, if the Solar power generated by his DSPV system could not be absorbed by the distribution system due to failure of power supply in the grid/distribution system for the reasons, such as line clear, load shedding and line faults, whatsoever.
i. This Consent given shall be in force for a period of 25 years from the date of commissioning of the DSPV system as detailed in the BESCOM Standard Operating Procedure (SOP).
j. All the disputes between the parties arising out of or in connection with this Consent given shall be first tried to be settled through mutual negotiation. The parties shall resolve the dispute in good faith and in equitable manner. In case of failure to resolve the dispute, either of the parties may approach the appropriate law Forum.
I undertake to abide by the provisions of:
I affirm that the information provided above is true and correct to the best of my knowledge and belief, and I have read and understood the terms and conditions governing the installation and operation of the DSPV system under the Net Meter Scheme.
I hereby agree and abide for the above consentAccount Id submitted in MNRE NAPS portal is Invalid or not Active.
Sending for Correction in MNRE NAPS Portal. Enter valid Account ID and Resubmit.
Note: Please refer Electricity bill for valid Account Id
Proposed Solar Capacity kW cannot exceed Sanctioned Load .
Sending for Correction in MNRE NAPS Portal.
Note:- Please Enter PM Surya Ghar National Portal Registration Reference Code OR Application Reference Code.
Eg. NP/Reg-1234/2024 or R-KABE24-123456 Eg. NP/1234/2024 or NP-KABE24-123456
FAST TRACK Load Enhancement Click Here
Account ID/Consumer ID: | |
Applicant Name: | |
Applicant Address: | |
Subdivision code: | |
Subdivision Name: | |
RR Number: | |
Sanctioned Load / Contract demand: | |
Connection Type: | |
Tariff category: |